This page allows you to change what information about documents is
displayed in various parts of DocDB. You can choose to change the
information just for yourself (you must allow cookies in your browser)
or, if your access level is high enough, for everyone. As a normal
user, you may only change the display of events you may modify. For
other changes that affect all users, please contact an administrator.
Leave all the field selections blank and select events, etc. to
return to the DocDB defaults for those lists.
If you are using multiple rows, and especially if you are spanning
columns or rows, it is easy to generate very difficult to read output.
Also, not all fields will have information in all contexts.
Scope of Changes:
For Everyone Only for me Predefined Lists:
Default
Event Group Default
Event Agenda
Conference Mode
Publications
Meeting Mode
Topics:
Administration and Documentation
-Agency Correspondence
-Photos of people `at work' - use as a secondary topic
-Budget Documents
--NSF Change Request Documentation
-Specific Letters and Emails
-DarkSide-20k Program Risks
-Help - Docdb, ID, Computing Accounts
-ES&H Documentation and Reviews
-Finance Board Stuff
-Logos of collaborating institutions ..
-MOUs/Agreements
-Management
--Board Membership
--Institutional Board Mtngs
-Meetings
-- Collaboration Meeting March 202
-Paper drafts
-Photos, Bios, Addresses
-Posters
-Presentations to Agencies
-Project Documents
-Proposals
-DarkSide Publications
-Articles in Public
-PO's, Tags, etc
-Reports to Agencies
--DS-20k Monthly and Quarterly Reports to NSF
-Official Reports to LNGS & INFN Committees
-Review Presentations and Outcomes
--Forti Reviews Closeouts
--Internal DS20k Reviews
-Schedules
-Snowmass
-Talks at Conferences
-Talks at Institutions (ie not Conferences)
-Stuff given to other people for their talks
-WBS & SOW
-Website
Analysis
-36Ar
-50 day campaign
-500 day UAr
-70 day UAr
-Analysis Meetings
-Process/Proposals for Blind Analyses
-Selection criteria -cuts,efficiencies, acceptances
-Data/MC comparison
-Displays
-Energy Scale
-Neutrinos
-PMT Analysis
-Pulse Shape Discrimination
-S2/S1
-Sensitivity Analyses
-X-Y
Properties of Argon
-Purity Measurement
Argon System
-Condenser
-Gas System
Backgrounds
-Calculations
-Material Assay
-Measurements
Calibrations
-argon light yield
-Insertion Devices
Computing
Cryogenics
-Cryocoolers
-Cryogenic Distillation
-Cryostat
-DS-20k Cryostat
-Insulation
-Cryogenic Piping
-Cryogenic System Schematics
Data Acquisition
-1495 Stuff
-DAQ-Proto-0
-Data Format
-DataBase
-Digitizers
-Rates and Range
-Run Control
-Slow Control (System Control)
-TPC Trigger
-V1720 & 1724 Documentation
-Veto Stuff
-Schematics on White Boards
DS20K
-Chimneys
--Electrics
---cable descriptions, definitions, specs, lengths etc
--Mechanics
-Coatings
-DAQ
-DS-20k Calibration System Notes and Drawings
-DS20K Inner Detector (DS20K ID)
--DS20K ID Engineering
---DS20K ID Assembly Tools
---DS20K ID Calculations & FEA
---DS20K ID Design Studies
-DS_20k_Cables&Connectors
-This topic contains all the documents related to the Veto system of DarkSide-20k
--DS_20k Outer Veto
--Documents and drawings of the calibration system for the veto detector
--DAQ architecture, info about both hardware and software of the data acquisition system
--Information about the veto electronics and photoelectronics. Design, specifications and test results
--Information about the gadolinium compound choice, radiopurity, mixing tests, annealing and tests at cold
--All the info concerning the infrastructures need to build, test and assemble the veto
--Topic dedicated to all the integration parts and procedures with the rest of the detector
--Information about the materials choice, radiopurity reports, cleaning procedures
--Drawings, descriptions and documents related to the mechanics of the whole veto and of the single pieces
--All the useful papers and documents used as ref in the veto design, construction and test
--Results on the design and test of the veto reflective panels, including also the WLS
--Results of the MonteCarlo simulations on the Veto
-Facilities and Infrastructures
-Installation
--I&I Recordings and Minutes
---Installation Meeting Recordings
---Minutes of Installation Meeting
-Integration
-Documents to do with Mock-up
-Photo-electronics
--Optolink
--PE meetings minutes
--SiPM stuff
--Signal Transmission on copper
-Prototypes
--DAQ for prototype program
--Napoli
--PDU Classic Documentation
--Proto_1ton
-Risk Registry for INFN TDR Dec. 2021
-TPC
Electrical and Electronic Items
-Amplifiers
-Cables
-Cold Pre-amps
-Signal and HV Feed-throughs
-High Voltage Stuff
-PMT Bases
-Power Supplies
Engineering
-Concept Design
-Drawings
-Specifications Lists
L1
-L2
--L3
---L4
Light Emission & Detection
-Photon Detector Unit
-PMT Information and Behavior
-QUPID
-Reflectors
-SiGHT
-SiPMs
-Wave-shifter Info
Liquid Scintillator
-Fluid Handling System
Mechanical Ventilator Miliano
-Administration
--Minutes-All
--Minutes-documentation
--Minutes_electrics
--Minutes-mechanical
--Minutes-medical
--Minutes-software
--Organization/Mailing Lists
--Reviews
---April 5 Review
--Talks and Presentations
-Documentation
--Drawings
--Photographs
--Test Recrods
--Tests and Demonstrations
-Electrics
--Displays
---Touch Screen Displays
-Mechanical Stuff
--Box
--Valves
---Flow Meters
---Instrumentation
---Pressure Sensors and Regulators
---Tubing
-Medical
-Proposal
-References
-Regulatory
-Requirements
-Software
Material Properties/Sources
Mechanics
-3-D Drawings
-DS20k installation
-Materials and their Properties
-Mechanical Pumps
-Mechanical Support Systems
Minutes-coordination
Offline Stuff
-Data Handling
-Reconstruction
-TPC
-Veto
Procedures
-CTF Procedures
-DS-10 Procedures
-LSV Procedures
-Run Controller Procedures
-Shift Procedures
-TPC Procedures
-UAr Installation and Filling at LNGS
-Validation
Reference Documents, Theses, etc.
-Historic Papers on Properties of Argon
-Manuals
-Material Data
-Standard photos
-Reference Papers
-Russian papers
-Theses
--Thesis Links
Simulations
-FLUKA
-Geant4
-Optical
-Sensitivity Plots
Info and analysis of calibration sources
-Alphas
-Beta and Gamma
-Neutron
Systems
-10 kg Detector
-One tonne TPC
-ARGO
-ARGO
-Argon Handling system
-Ar Recovery System
-CTF Tank
-Condenser Booster
-Cryostat
-DArT
-DS-20k
-DarkSide - G2
-DarkSide 50 Full Detector
-Distillation Column
-Evaporator
-Extraction Plant (Cortez)
-Inner Detector
-Detector for Ar39 measurement
-Low Mass
-MAX
-Naples Test Facility for photoelectronics
-Neutron Veto
-Prototype for DS-20k at CERN
-ReD
-ScENE
-TPC
-Water Tank/Muon Veto
Underground argon (extraction, filtration, measurements)
-Aria Distillation Project
-Cortez Plant Stuff
-Helium Removal
-Purification, Contaminant Removal,Gettering
-All items to do with transportation
-Urania Extraction Project
Document type:
External Talk
References
Minutes
Drawings
Schematic
Agency Communications
Project document
Photos
Publications
Note
Reports to Agencies
Internal Presentation
Event Groups:
Meeting
Analysis Page
Internal Review
Events:
Meeting:ICRC 2023 (26 Jul 2023)
Meeting:DarkSide General Meeting Pula 2017 (12 Jun 2017)
Meeting:DarkSide 2016 Winter Meeting (25 Jan 2016)
Meeting:DS Collab. Mtng 6-29-2015 (29 Jun 2015)
Meeting:SiPM Workshop (23 Jun 2015)
Meeting:General Meeting (28 Jan 2015)
Meeting:Milan Meeting (11 Dec 2014)
Meeting:calibration plan WG meeting (27 Oct 2014)
Meeting:calibration plan WG meeting (20 Oct 2014)
Meeting:calibration plan WG meeting (06 Oct 2014)
Meeting:calibration plan WG meeting (22 Sep 2014)
Meeting:calibration plan WG meeting (15 Sep 2014)
Meeting:calibration plan WG meeting (08 Sep 2014)
Meeting:calibration plan WG meeting (18 Aug 2014)
Meeting:calibration plan WG meeting (11 Aug 2014)
Meeting:calibration plan WG meeting (28 Jul 2014)
Meeting:calibration plan WG meeting (14 Jul 2014)
Meeting:calibration plan WG meeting (07 Jul 2014)
Meeting:June 2014 Collaboration Meeting (16 Jun 2014)
Meeting:Collaboration Meeting (19 Feb 2014)
Meeting:G-2 Mechanics (19 Jul 2013)
Meeting:G2 Photosensor Workshop 7/18/13 (18 Jul 2013)
Meeting:G2 Electronics Workshop (28 May 2013)
Meeting:General Meeting - Jan 31-Feb 1 2013 (31 Jan 2013)
Meeting:Offline WG Planning (13 Dec 2012)
Meeting:DS-50 Fluid Handling System (12 Dec 2011)
Meeting:DS-50 Technical Meeting (01 Nov 2011)
Meeting:Electronics & DAQ Meeting (02 Oct 2011)
Meeting:L2 Managers Sep 29 2011 Meeting (29 Sep 2011)
Meeting:L2 Managers Sep 19 2011 Meeting (19 Sep 2011)
Analysis Page:Analysis DS-10 @ LNGS (25 Jul 2011)
Internal Review:Electronics (21 Jun 2011)
Meeting:L2 Managers June 20 2011 Meeting (20 Jun 2011)
Internal Review:Internal and External Detectors Mechanics (16 Jun 2011)
Internal Review:Argon supply and recovery system (15 Jun 2011)
Meeting:L2 Managers June 13 2011 Meeting (13 Jun 2011)
Meeting:L2 Managers June 1 2011 Meeting (01 Jun 2011)
Meeting:L2 Managers May 23 2011 Meeting (23 May 2011)
Meeting:L2 Managers May 18 2011 Meeting (18 May 2011)
Meeting:Genova General Meeting (18 Mar 2011)
Meeting:IHEP Beijing - DS 2/12-2/14 2011 (14 Feb 2011)